What a Complete Installation Quote Includes
- A complete quote names the equipment by model and lists every piece of work around it: venting, gas line, electrical, condensate, permit, disposal, startup and warranty registration.
- Most of the price difference between two quotes is not the furnace itself; it is the scope of the work around the furnace and whether that work was included or left out.
- In Greater Vancouver a high-efficiency gas furnace replacement typically lands in a ballpark range of $5,000 to $9,000 installed, with complex jobs higher.
- Gas fitting and most electrical work are legally restricted trades in BC, so a valid quote comes from a licensed contractor and includes a permit and inspection line.
- Ask for a heat loss calculation, not a rule-of-thumb size. A furnace sized off the old unit’s rating plate is a guess, not a design.
- Quotes that read as one lump sum with no scope written down are the ones that generate change orders on installation day.
A complete gas furnace installation quote lists the specific equipment you are buying and every piece of work required to make it run safely and legally in your house: the furnace model and stage or modulation type, the venting material and route, gas line sizing and any modification, the electrical circuit and any control wiring, condensate routing and neutralization, ductwork or plenum transitions, the permit and inspection, removal and disposal of the old unit, startup and commissioning with measured readings, and warranty registration. Anything not written on that page is not in the price, which is why two quotes for the same brand can differ by thousands of dollars. Below is how to read a quote line by line, what moves the number up or down in Metro Vancouver housing, and the questions to ask before you sign. BC Wide Home Services Ltd has installed and serviced gas heating across Metro Vancouver since 1999, and we are an independent TSBC-licensed contractor, licences LGA0090068 and CGA0028029, not a factory-authorised dealer for any brand.
What exactly should be written on the quote?
A quote is a scope document with a price attached. The price is the least interesting part of it. What you are actually checking is whether the contractor has looked at your house closely enough to know what the job requires, and whether they have committed that understanding to paper where it can be held to.
If a line item is missing, assume the work is not included. That is not cynicism, it is simply how quoting works. A furnace swap that turns out to need a new vent route or a resized gas line is a different job than the one that was priced, and the difference gets settled either as a change order on installation day or as an argument.
- Equipment: manufacturer, model number, capacity as it appears on the manufacturer’s documentation, single-stage, two-stage or modulating, and the blower motor type.
- Venting: material, diameter, total length, the termination location, and whether it is a new penetration or reuses an existing one.
- Gas: the connection, whether the existing line is being reused, resized or extended, and who verifies the sizing.
- Electrical: the dedicated circuit, any disconnect, low-voltage control wiring, and whether an electrical permit applies.
- Condensate: the drain route, the pump if one is needed, and neutralization where required.
- Distribution: plenum and transition fabrication, filter cabinet, and any duct modification at the furnace.
- Thermostat: the model being installed and whether it is compatible with staging or future heat pump control.
- Administration: permit and inspection, old equipment removal and disposal, site protection and cleanup, startup readings, warranty registration, and the labour warranty offered by the contractor.
What does a furnace installation actually cost in Greater Vancouver?
For a straightforward high-efficiency gas furnace replacement in a Greater Vancouver home, the installed ballpark range is roughly $5,000 to $9,000 before GST, with genuinely complex jobs sitting above that. These are ballpark figures for orientation only. They are not a quote, and an accurate price for your house needs a site visit, because the work around the furnace is what determines where inside that range you land.
If you are considering dual fuel, where a heat pump is added and the gas furnace stays as the backup heat source for cold snaps, the ballpark range for adding the heat pump side to an existing furnace is roughly $10,000 to $18,000, and an electrical panel upgrade is extra where one is needed. Gas line work priced as its own item for a new appliance connection runs a ballpark $500 to $1,500 for a short, accessible run and $1,500 to $3,000 or more for a long or difficult one. Again, ranges, not quotes.
Notice how wide those ranges are. That width is honest. Anyone who gives you a precise number over the phone, before seeing your venting route, your gas line and your electrical panel, is naming a price for a job they have not yet understood.
Why is one quote thousands of dollars higher than another?
Almost always because the scope is different, not because the equipment is different. Two contractors can quote the same furnace and arrive at prices far apart because one included a new vent route through a finished ceiling and the other assumed the old vent could be reused, or because one priced a condensate pump and neutralizer and the other planned to drain into whatever was nearby.
The fair way to compare is to put the two quotes side by side and mark every line that appears on one and not the other. Then ask the contractor whose quote is lighter what they intend to do about each missing item. Sometimes the answer is legitimate: the venting truly does not need replacing. Sometimes the answer reveals the gap.
| Line item | What it covers | What happens if it is missing |
|---|---|---|
| Heat loss calculation | Sizing the furnace to the house rather than to the old unit | The furnace is oversized, short cycles, and never runs at its best efficiency |
| Venting | Material, diameter, length and termination for the new appliance | Vent work becomes a change order once the old vent is found unsuitable |
| Gas line and sizing | Verifying the existing line carries the new load, resizing where it does not | Undersized gas supply shows up as nuisance faults after startup |
| Electrical circuit | Dedicated circuit, disconnect and control wiring | Electrical work is added on installation day or deferred to another trade |
| Condensate handling | Drain routing, pump where gravity will not work, neutralizer where required | Acidic condensate is routed improperly or left to the homeowner to solve |
| Plenum and transitions | Sheet metal fabrication where the new cabinet differs from the old | Airflow suffers and the install looks improvised |
| Permit and inspection | Municipal or Technical Safety BC permit and the inspection that follows | No record of a compliant install, which matters at resale and for insurance |
| Removal and disposal | Taking the old appliance away and disposing of it | The old furnace stays in your basement until you deal with it |
| Startup and commissioning | Measured gas pressure, temperature rise and combustion readings | Nobody proves the unit was set up correctly before the van left |
| Warranty registration | Registering the equipment with the manufacturer within their window | Coverage may fall back to a shorter default term |
What moves the price within the range?
Sizing and heat loss come first. A proper heat loss calculation looks at the building envelope, window area, insulation and air leakage, and it often produces a smaller furnace than the one being replaced, because the old unit was itself sized by rule of thumb decades ago. Right-sizing usually reduces equipment cost and improves comfort, but the calculation itself is labour.
Venting is the single biggest swing factor in older Metro Vancouver houses. A high-efficiency furnace vents through plastic pipe out a sidewall, not up the old masonry or B-vent chimney. If the mechanical room sits in the middle of the floor plan, that pipe has to travel, sometimes through finished ceilings, and termination clearances from windows, doors, decks and property lines have to be respected. A short run to an exposed exterior wall is inexpensive. A long run through finished space is not.
Gas line capacity matters whenever total appliance load changes or the existing pipe is marginal. Electrical matters when there is no dedicated circuit at the furnace, or when dual fuel brings a panel into the conversation. Condensate matters when there is no gravity drain within reach. Access matters: a walk-in basement with a wide door is one job, a crawlspace hatch or a fourth-floor mechanical closet reached by elevator is another. Code upgrades discovered during the work, such as combustion air provisions in a tight mechanical room, add scope. And staging matters: single-stage, two-stage and modulating furnaces differ in both equipment cost and in the control work around them.
- Size and heat loss: the calculation drives the equipment selection.
- Venting route and termination: distance, penetrations, finished surfaces and clearances.
- Gas line sizing and any extension or resizing required.
- Electrical: dedicated circuit, disconnect, control wiring, panel capacity for dual fuel.
- Condensate routing, pump and neutralization.
- Plenum, transitions, filter cabinet and any duct modification at the appliance.
- Access, removal and disposal of the old equipment.
- Permits, inspection and any code upgrade the inspection requires.
- Stage or modulation choice and the thermostat that controls it.
Which items should appear on the quote without a dollar figure attached?
Some items belong on a quote as named line items even though no honest contractor can put a firm number beside them at quoting time. Permit fees are set by each municipality or by Technical Safety BC, and they vary by jurisdiction and by the scope of the permit, so a quote should name the permit as an included line and tell you how the actual fee is handled.
Rebate and incentive programs change their eligibility rules and their amounts on their own schedule, and they are administered by the programs, not by your contractor. A good quote tells you which programs your chosen equipment is likely to qualify for and what documentation you will need, without pretending to know what will be approved. Financing, where it is offered, is a separate agreement with its own terms that you read on its own paper.
Diagnostic and service call arrangements, and any maintenance plan or tune-up offering, are also separate from the installation price. Ask how they work, get the answer in writing, and keep them mentally distinct from the installed cost of the job.
How does Metro Vancouver housing change what the quote has to cover?
Our coastal climate is mild and wet, which means heating loads here are moderate compared with the Prairies and a right-sized furnace is often smaller than homeowners expect. It also means condensate is produced for a long shoulder season rather than a short intense winter, so condensate handling deserves real attention rather than a token line.
The housing stock is the bigger factor. Large parts of Burnaby, Vancouver, New Westminster, North Vancouver, Coquitlam and Surrey are full of houses built long before high-efficiency venting existed. Those homes were designed around a chimney, and converting to sidewall venting is genuine work. Many have had basements finished at some point, which puts drywall between the mechanical room and the nearest exterior wall.
Strata and multi-family properties add another layer. Mechanical rooms are small, access is scheduled, common property may be involved in a venting penetration, and the strata may require its own approval before work begins. A quote for a strata unit should say who obtains that approval and what happens to the schedule if it is delayed.
Permitting differs by municipality across Metro Vancouver. Requirements, processing times and inspection scheduling are not identical from one city to the next, and a contractor who works across the region should be able to tell you what to expect where you live.
What questions should you ask before signing?
The goal is to find out whether the person quoting has actually studied your house. These questions surface that quickly, and the quality of the answers tells you more than the bottom line does.
- Did you perform a heat loss calculation, and may I see it? If the size came from the old unit’s rating plate, ask why.
- Where exactly does the vent terminate, and what does the route look like through my house?
- Is the existing gas line adequate for this appliance and my total load, and how did you verify that?
- Is there a dedicated electrical circuit at the furnace now, or is one being added?
- How is condensate being handled, and does this install need a pump or neutralizer?
- Who pulls the permit, and what does the inspection process look like in my municipality?
- What commissioning readings will you take at startup, and will I get a copy?
- What is covered by the manufacturer’s parts warranty, what is covered by your labour warranty, and who registers the equipment?
- What is specifically excluded from this quote, and what would trigger a change order?
What does commissioning mean, and why does it belong on the quote?
Commissioning is the difference between a furnace that is installed and a furnace that is set up. After the unit is connected, the technician verifies manifold and inlet gas pressure against the manufacturer’s specification, checks temperature rise across the heat exchanger and adjusts blower speed until it falls within the published range, confirms the venting draws correctly, tests the safeties, takes combustion readings, and confirms the thermostat controls every stage the furnace has.
Those specifications are published by the manufacturer on the rating plate and in the installation manual, which is where you verify them for your specific model. Do not accept invented numbers for capacity, efficiency or pressures from anyone, including a salesperson. The plate and the manual are the authority.
A furnace that skips commissioning can run for years while quietly operating outside its design window, which costs you efficiency, shortens component life and can mask a developing combustion problem. Ask for the readings in writing. A contractor who takes them will have no difficulty handing them over.
When should you call a licensed technician?
In British Columbia, gas fitting is a licensed trade and so is most electrical work. A homeowner may change filters, keep the area around the furnace clear, operate the thermostat, check that supply and return registers are open, and note symptoms carefully. A homeowner may not connect or alter gas piping, open a sealed combustion chamber, modify venting, or wire a new circuit.
Call a licensed technician if you smell gas, if a carbon monoxide alarm sounds, if the furnace locks out repeatedly, if you see soot or scorching around the appliance, if the vent termination is blocked or damaged, or if the unit short cycles. Same-day attendance is often possible in Metro Vancouver, and it is honest to say it is not always possible, since it depends on the day’s call volume and where the crews already are. We will tell you plainly what we can do and when, rather than promising a window we cannot hold.
If you would like a written, itemized quote for a furnace replacement or a dual fuel system at your home, BC Wide Home Services Ltd can attend, perform the heat loss calculation, look at the venting, gas and electrical realities in your house, and put the scope on paper so you can compare it against anything else you are holding. Call (604) 473-9690.
Frequently asked questions
Is a verbal price over the phone a quote?
No. A phone estimate is a rough orientation at best, because nobody has seen your venting route, your gas line, your electrical panel or your access. A real quote is written, itemized, and issued after a site visit. Treat a firm phone number as a warning sign rather than a convenience.
Should the permit be included in the installation price?
The permit should always appear as a named line item on the quote, and the contractor should be the one pulling it for gas work. Permit fees themselves are set by each municipality or by Technical Safety BC and vary by jurisdiction and scope, so ask how the actual fee is handled rather than expecting a fixed figure on the quote. An install with no permit and no inspection leaves no compliance record, which matters when you sell the house.
Why does the quote list a heat loss calculation instead of just matching my old furnace size?
Because the old furnace was probably sized by rule of thumb decades ago, often before insulation upgrades or window replacements. A heat loss calculation sizes the new furnace to the house as it is today, which frequently means a smaller unit. An oversized furnace short cycles, heats unevenly and wears its components faster.
What is usually excluded from a furnace quote?
Common exclusions are duct redesign beyond the furnace connections, asbestos or vermiculite abatement if either is discovered, drywall repair after venting penetrations, electrical panel upgrades, and any code upgrade an inspector requires that was not visible at quoting. Ask for the exclusions in writing and ask what would trigger a change order. A contractor who has thought about your house will answer that easily.
Does a quote for adding a heat pump work differently?
It covers everything a furnace quote does plus the outdoor unit location and mounting, refrigerant line routing, the electrical circuit and panel capacity, and the control strategy that switches between the heat pump and the gas furnace. We lead with dual fuel in Metro Vancouver, keeping the gas furnace as the backup heat source for cold snaps, so the quote should make the changeover logic explicit. Refrigerant work is restricted to certified technicians throughout.
How do I verify the efficiency and capacity figures on my quote?
Check the model number on the quote against the manufacturer’s own published documentation, and check the rating plate on the installed unit once the work is complete. Those two sources are authoritative. Do not accept a capacity or efficiency figure from memory or from a brochure that does not name your exact model.
Is BC Wide a factory-authorised dealer for the brand I have chosen?
No. BC Wide Home Services Ltd is an independent TSBC-licensed contractor, licences LGA0090068 and CGA0028029. We install and service equipment from a range of manufacturers, but we are not a factory-authorised dealer, distributor or warranty centre for any brand, and we will tell you plainly which warranty obligations sit with the manufacturer and which sit with us.
BC Wide Home Services — Lower Mainland home-comfort specialists since 1999
Technical Safety BC Licensed Gas Contractor (LGA0090068) · Class B Gas Licence (CGA0028029) · Red Seal technicians · Evening and weekend calls · Diagnostic service calls $189.00 · Free in-home estimates on replacements (the $189.00 is waived if you replace with us). Call 604-473-9690 or book a free replacement estimate.
Frequently asked questions
What HVAC services does BC Wide offer in Metro Vancouver?
How long has BC Wide been in business?
What areas do you serve?
Are BC Wide technicians licensed and insured?
How can I book a service call?
Do you offer free estimates?
What brands do you service?
Do you offer government rebates for heat pumps?
How quickly can you replace a broken hot water tank?
Why should I choose BC Wide over other HVAC companies?
What Greater Vancouver homeowners say about BC Wide
Get a Free Quote — Right From This Page
Request a Free Quote
Get Comfortable — Talk to BC Wide Today
Free, no-obligation quotes. TSBC-licensed local technicians serving Greater Vancouver since 1999.


